Slope stabilazation
Info
InfoESD40Ⅱ Yamatsuri-yama, Fukushima Prefecture
ESD40II successfully operated at a huge rocky mountain surrounded by pine trees. |
Info
InfoESD40Ⅱ Enzan, Yamanashi Prefecture
Compact and yet high performance ESD40Ⅱ can be sucessfully utilized for special construction methods. |
Info
InfoESD40Ⅱ Manazuru, Kanagawa Prefecture
The ESD40Ⅱ shows its abilities best at sites which require large-scale scaffolding. |
Info
InfoESD40Ⅱ Numata, Gunma Prefecture
Machine units were transported to the site without difficulty where transport method was only a small monorail. |
Info
InfoESD40Ⅱ Takakura, Kanagawa Prefecture
Even in places where it can’t stand independently, with the ESD40Ⅱ, which has a double pipe excavation capability, you can expect good results. |
Info
InfoESD40Ⅱ Tomioka, Hyogo Prefecture
Even in the limited space behind homes, there is plenty of room for the ESD40Ⅱ. |
Info
InfoESD40Ⅱ Shinyamashita, Kanagawa Prefecture
Even on sites right under residential land, the ease of placement and operation mean that safety and peace of mind are assured. |
Info
InfoESD40Ⅱ Okutama area, Tokyo prefecture
Set up the machine on a site high up in a forest. The light weight and small size show its true potential on such sites. |
Info
InfoESD40Ⅱ Shiratori, Gifu Prefecture
OperationIt at the face of a waterfall. Electric unit is nature-friendly. |
Info
InfoESD40Ⅱ Yaita, Tochigi Prefecture
The set of units is positioned in between cluster of cedar trees. Easy transportation and set-up, being a compact. Because of its light weight, it’s easy to maneuver. |
Info
InfoESD90 Kuroho, Shizuoka Prefecture
Makes construction work possible even in the confined space of a forest road. |
Info
InfoESD210 Chichibu, Saitama Prefecture
It shows its abilities best at sites which require large-scale scaffolding. |
Info
InfoESD210 Musashi-kosugi, Kanagawa Prefecture
A good match for tight spots on the side of railway lines. |
Info
InfoESD210 Makinohara, Shizuoka Prefecture
It can also bore large-diameter holes. |